Works Instructions
Up Quality Based Programes Works Instructions Quality - TQM1

 

QUALITY SYSTEMS - WORK INSTRUCTIONS

The following work Instructions are used by Summit Systems clients with quality management system. These are modified for the client and when required specific new Works Instructions are designed.

(The W. I. listed retail once modified for $100 ea, new W.I. are designed for $300 ea).

SPECIFICATIONS LIST AND CONTRACT DOCS SCAFFOLDING CONTRACTORS
FORECASTING AND SCHEDULING PROJECTS TIMBER STRUCTURE CONSTRUCTION
MEASURING AND TESTING EQUIPMENT EXTERNAL CLADDING APPLICATION
SURVEYING, PEGGING AND MARKING OUT STEEL STRUCTURE MANUFACTURE
CORE SAMPLING AND TESTING STEEL STRUCTURE ERECTION ERE
CAMP ESTABLISHMENT AND STANDARDS ROOFING TILES AND SLATE MANUFACTURE
PURCHASE OF MATERIALS METAL ROOFING MANUFACTURE
ESTABLISHING CONSTRUCTION SITE ROOFING CONTRACTORS
PREPARATION OF TENDERS INSULATION CONTRACTORS
EARTHMOVING EQUIPMENT & MOBILE PLANT ELECTRICAL COMPONETRY MANUFACTURE
CRANES, HOISTS AND LIFTING PROCEDURES ELECTRICAL CONTRACTORS
TRANSPORT VEHICLES (TRUCKS) PLUMBING AND DRAINAGE CONTRACTORS
VEHICLE TRANSPORTATION GAS FITTERS AND CONTRACTORS
ROAD TRANSPORT-MATERIAL APPLICATION WINDOW FRAMES AND HARDWARE
ROAD TRANSPORT - LIVESTOCK CARTAGE GENERAL MAINTENANCE
EXCAVATION PROCEDURES DOOR FRAMES AND HARDWARE
LAYING OF PIPES PROCEDURES GLAZING CONTRACTORS
LAND DRAINAGE SYSTEMS INTERNAL CLADDING AND COMPONETRY
PIPE SUBSOIL DRAINAGE GIB BOARD CONTRACTORS
MAINTENANCE OF STORMWATER SYS. STAIRWAYS AND BALCONIES
TRAFFIC CONTROL ON HIGHWAYS BRICK AND BLOCK MANUFACTURE
SANDBLASTING AND BURNING BRICK AND BLOCKLAYING CONTRACTORS
CORROSION CONTROL MEASURES STONE MASONRY CONTRACTORS
FENCING CONTRACTORS FIBROUS PLASTER CONTRACTORS
PILE DRIVING CONTRACTORS JOINERY AND FURNITURE
DAIRY BY-PRODUCTS PAINTERS AND DECORATORS
RESCUE MISSIONS CARPET AND FLOORING SYSTEMS
AIR APPLICATION OF AGRI. MATERIALS SOLID FUEL OR BOILER HEATING SYSTEMS
MEDICAL CLINIC AIR CONDITIONING SYSTEMS
CLIENT SITE MEDICAL PROCEDURES FIRE PROTECTION SYSTEMS
DRILLING CONTRACTORS LIFT INSTALLATIONS
DEMOLITION CONTRACTORS SWIMMING POOL INSTALLATIONS
CONCRETE WORK AND KERBING LANDSCAPING CONTRACTORS
CUTTING CONCRETE PROCEDURES FACILITIES FOR DISABLED
REINFORCING CONCRETE PROCESSES VEGETATION SPRAYING PROCEDURES
FALSEWORK AND CONCRETE SLABS MOTOR VEHICLE WORKSHOP
PRECAST CONCRETE UNITS TUNNEL CONTROL PROCEDURES
TIMBER STRUCTURE MANUFACTURE DETRITUS REMOVAL
LAYING CONCRETE FOUNDATIONS LITTER AND RUBBISH REMOVAL

 

Back Next

Last modified: Thursday January 21, 1999.
Questions or problems regarding this web site should be directed to  sslcentral@xtra.co.nz or Ph 06 3288 882 Mobile 025 407 622
Design of this web is Copyright © to the  Webmaster JJP WEBS. All rights reserved.

jjpweb1.gif (4590 bytes) Summit Systems Ltd company logo Smwkcomp.gif (1856 bytes)

The information related in this web and associated webs http://sendme.to/summit,   and www.workerscompo.co.nz  are trademarks™ and Copyright © of Workers Compensation Insurance Limited and Summit Systems Ltd. All other products mentioned are registered trademarks or trademarks of their respective companies.